Clean Room

Clean Room

Clean Room Video Demo

Hoisting Operation Site   

Clean Room Video Demo

Apply Glass Adhesive During On-site Construction  

Purification Workshop Construction Process Flow

Purification Workshop Construction Process Flow : Step 1: Floor polishing, primer for epoxy resin floor paint. Step 2: Purification air conditioning and air supply pipeline installation. Step 3: Installation of c

Single Layer Door Material (1.0)

Basic parameters   Material name Door material (door frame material) Aluminum thickness 1.0mm Surface effect Oxidized scrub Standard Length 6000mm

Single Layer Door Material (0.8)

Basic parameters   Material name Door material (door frame material) Aluminum thickness 0.8mm Surface effect Oxidized scrub Standard Length 6000mm

Double-deck Door Material (1.2)

Basic parameters   Material name Double-deck Door Material (1.2) Aluminum thickness 1.2mm Surface effect Oxidized scrub Standard Length 6000mm