What problems should we pay attention to when planning the production workshop of SMT equipment?



The newly established SMT electronics workshop, the biggest problem is the planning of the SMT workshop, what should be paid attention to when planning? KINGSUN is here to discuss and introduce the problems to be paid attention to in the planning of SMT production workshop.


Some details of the layout of the SMT workshop require that the temperature control and ventilation system of the workshop be taken into account after the approximate location of the production line is determined.In the SMT production process, the precision electronic components need to be in a stable temperature environment to ensure the stable operation of the equipment. Therefore, the workshop must have a special temperature control system, and a good ventilation system in order to discharge harmful gases.



Let's first analyze the auxiliary tools required for the SMT production line and the location requirements for each region:


 

1. Fire extinguisher storage area

Fire extinguishers should be placed next to the column and around the SMT workshop in accordance with fire regulations.


 

2. Rack carts storage area

The material rack carts is used for material replacement during the production and model switching of SMT production lines. In order to facilitate production and improve the efficiency of material replacement, it is best to place the material rack truck near the SMT machine.


 

3. Preparation table placement area

The material preparation table is mainly used for the material preparation in the production process and the material preparation before the machine type switch, so the material preparation table should be placed near the placement machine, and it is best to put it together with the material rack cart, so that it is convenient to put it directly on the material rack cart after preparing the material.


 

4. Printing station small table placement area

The printing desk is used for the placement of printing machine auxiliary tools in production, such as wiping paper, solder paste, alcohol, etc., which should be placed near the printing machine for easy access and use to improve production efficiency.


 

5. Solder paste placement area

The solder paste placing area includes the refrigerator for storing the solder paste, the solder paste mixer, the solder paste return temperature cabinet, etc., which can be placed next to the column or in a fixed area around the workshop according to the requirements of the workshop, but it should be easy for the operator to take and put.

 

6. Visual inspection area and maintenance area behind the furnace

In order to facilitate visual inspection and repair of semi-finished products after reflow soldering, a small table is generally placed behind the furnace, specifically for visual inspection and repair after the furnace.


 

7. Mesh placement area

The mesh placement area includes mesh placement cabinets, mesh cleaning machines, mesh inspection tools, etc., used for storage, cleaning, and tension inspection of mesh panels. At the same time, this area should be as convenient as possible for the retrieval and placement of mesh panels in production.


In summary, SMT production workshop planning needs to consider various aspects, including workshop layout, temperature control, reasonable utilization of resources, safety precautions, etc., to ensure the safe and stable operation of the workshop.


KINGSUN provides overall solutions for SMT equipment and 3C intelligent factories.


Professional electronic manufacturers provide SMT equipment and services: SMT machines, printers, reflow soldering, SPI,  AOI and other SMT production line equipment; Peripheral equipment and accessories such as linking conveyors, splicer machine, loader and unloader, dispensing machine, coating machine, suction nozzles, feeders, cameras, motors, boards etc...For more information about products, please Contact US at jenny@ksunsmt.com or visit www.ksunsmt.com .




 

07,2023,Jun

Looking for best partner for your next construction works?

Contact Us

24 hours online service